Skip to content

V1: Estimate standalone solar power budget #17

Description

@mastertape

Roadmap reference: docs/roadmap/dhl-paketkasten-retrofit-v1.md

Estimate whether the first standalone ESP-based DHL parcel box retrofit can be solar-supported.

Acceptance criteria:

  • ESP idle/sleep and active current assumptions are listed.
  • Keypad/RFID/fingerprint reader idle current is measured or estimated.
  • Lock actuation peak current and duration are measured or estimated.
  • Door sensor and tamper sensor current are listed.
  • Battery chemistry and capacity options are compared.
  • Charge controller / solar module assumptions are documented.
  • Winter reserve target is proposed.
  • Power design stays low-voltage only; no mains voltage on prototype boards.

Non-goal:
No final outdoor-certified power design is required in this issue.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    area:firmwareDevice firmware and local controller behaviorarea:hardwareHardware, Core, Backplane, power and portspriority:P1Important for first prototype

    Type

    No type

    Projects

    No projects

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions