Skip to content

changelog: reconcile v0.8.0 with the merged restart repairs - #1825

Merged
ZeroPoint95 merged 2 commits into
devfrom
release/changelog-v0-8-0-followup-20261014
Oct 14, 2026
Merged

ZeroPoint95 merged 2 commits into
devfrom
release/changelog-v0-8-0-followup-20261014

Conversation

@ZeroPoint95

@ZeroPoint95 ZeroPoint95 commented Oct 14, 2026 •

Copy link
Copy Markdown
Collaborator

The v0.8.0 release record predates the two merged learned-memo restart repairs. Reconcile its existing section with all 35 accumulated entries and 156 invalidations, consuming the three later loose entries for #1821, #1823 and #1824. The original 32 records and every older release section remain byte-preserved; there is exactly one v0.8.0 section and no product-code change.

Final candidate e93b4a927017b755f8cfdec1a29ec0724cf44751 is based on merged dev c68873af34fea9c8eea22cb69a88b8991e323920. Required local gate, fresh release-tool tests, canonical build, record integrity and independent review passed. The assigned-number internal entry for #1825 is included; it remains the single loose entry for what lands next. Final-entry independent review passed.

Affected restart and concurrent learned-fact recovery checks passed with race detection on the merged repair tree. Historical partial and failed model-review trials retain their coverage labels; misleading intermediate empty-review progress wording remains an accepted deferred follow-up. No additional model trial is represented by this roll-up.

The release runbook requires this record to land on dev before selecting the next exact staging candidate. Maintainer review and merge remain required. Promotion will require a successful Full check and matching staging publication on that eventual merged commit. Stable and production are outside scope.

@ZeroPoint95
ZeroPoint95 marked this pull request as ready for review October 14, 2026 06:37
@ZeroPoint95
ZeroPoint95 merged commit 8ebf000 into dev Oct 14, 2026
6 checks passed
@ZeroPoint95
ZeroPoint95 deleted the release/changelog-v0-8-0-followup-20261014 branch October 14, 2026 06:39
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant